Thanks to Lisa, Rachelle, Pete, David, Jimmy, Rich, Carden for getting this old tub whipped into shape!
|
Jimmy working on the winches |
|
Carden going at the electrical problem |
|
Rich, David and Rachelle on the dock |
Thursday night we rebuilt 3 winches and hopefully the remaining 8 will get done this weekend. I replaced the mascerator and installed new venting for the heater. Also finished up the sink drains.
Emptied the two aft lazerrettes also. Found two old electric motors and various cleaners and an old metal bucket that was starting to rust.
|
Old shelf where the forward heads pump was. Frozen solid. Why PO didn't remove it, I have no idea. |
|
Sink connection |
No comments:
Post a Comment