Boy have I been remiss on posting on our blog. 
So the boat got hauled out May 1st.  The mast was then dropped and Chris Tutmark (rigger) started to go over the mast.  Lots of work to do. 
The big problem is the mast collar is broke in two pieces.  What a pain!  No one has one.  Not sure what we are going to do.  it will be the one thing that makes us miss Swiftsure.  Grrr!
Alan and I taking Appa through the locks and under the Burlington Northern bridge



See the crack? 



This computer at work sucks!!
Cannot get my photos on the blog.




This is the punchlist:
  1. Two coats of Sr 60 bottom paint.
  2. Keel/hull joint refilled and faired
  3. Prop strut inspected and faired
  4. New through hull for emergency bilge pump
  5. Put in and run hose of the new emergency bilge pump.
  6. Buff and wax hull
  7. Drop the rudder and inspect bearings
  8. Pull mast and replace standing rigging
  9. New mast collar
  10. Install new Raymarine X-30 course computer with P70 AP controller and integrate with existing ST50 instruments
  11. Windlass motor rebuild
  12. Spare alternator rebuild
  13. Fresh water coolant pump and bearing replaced
  14. New timing belt on Prima 50 Perkins
  15. Tighten keel bolts
  16. Run new wiring though mast
  17. Install new Raymarine i60 wind gauge and transducer
  18. Install new nav station panel and mount ST60 instrument, Watchmate AIS, weatherfax and barometer
  19. rewire electrical panel
  20. Fix light and engine alarm at engine control panel
  21. New blower for engine room
  22. Raise the waterline
  23. Run new small bilger pump hose.
  24. Replace all through hull and hoses
That is all I can think of right now.

Here are some more photos.




    Spreaders getting pulled.  The shrouds were "captured" by a bent bolt and nut.  Again with the jury rigged stuff by the previous owner!!

    Old owner coated the base of the mast with epoxy.  Why?  The things that other owners do. 



    This actually is an improvement if you can believe that
The newest member of our family!
Appa after getting buffed out. 



Beebee standing next to our new Rocna!

Keel/hull joint getting fixed

My buddy Tom's J109 Pathfinder in front of Appa

Beginning of new nav station area

My man Jugurtha making the station


Pathfinder and Appa getting the bottom treatment


Dancing while you work.

New valve for galley sink



under the head sink through hulls



New crash bilge pump

Before the remodel


New blower motor

Crash pump switch.  Connected directly to the house bank


So we are still on the hard at CSR.  Waiting on engine parts from England.  Due in on Friday. 
We are probably not going to do Swiftsure.  Just don't see how it all can come together in time.
We'll see.